Auto Mains Fail Transfer Switch :: ComAp Inteli-ATS

This automatic transfer switch uses a ComAp ATS Controller combined with motor contactor switching to provide a fully-featured ATS with full metering & history logging, and can also be remotely monitored.

Motor Contactor Selection

The appropriate size of motor contactors should be selected based on the load served and the genset size. The 400A frame is a good general purpose selection, but smaller or larger can substituted. Recommended source: FactoryMation.com (225A frame and larger have 100-240VAC/DC coils)




See warnings below



One-Line Diagram

Auto Mains Fail Transfer Switch

One-line diagram, detailed schematic/wiring diagram, and parts list:


(DSN) files can be edited with TinyCAD.

Description of Operation

Contactors K-U [3] and K-G [5] are mechanically and electrically interlocked to ensure that only one can be closed at a time.

Definitions

Utility Power Failure

  1. Starting with Utility Power being supplied to the load: Contactor K-U [3] is closed, and all timers have expired.
  2. Power is removed from the coil for K-U [3] if:
    1. Utility power fails
    2. Voltage on any phase exceeds minimum or maximum voltage setpoint.
    3. Frequency exceeds minimum or maximum setpoint
    4. Phase rotation is reversed
  3. When K-U [3] opens:
    1. Load is disconnected (Preventing damage to equipment caused by low voltage.)
  4. If utility power fails to return within 5 seconds:
    1. InteliATS closes KGS [6] to start the genset
  5. Once the generator is running, the InteliATS:
    1. Qualifies input for minimum, maximum voltage on all phases, correct phase rotation, minimum, maximum frequency
    2. Illuminates L-G (Blue) indicating generator power is OK.
    3. Begins countdown (5 seconds).
  6. K-G [5] then closes:
    1. Supplies generator power to the load
    2. Opens the neutral connection for the coil on K-U [3], preventing K-U [3] from closing by accident.
    3. Illuminates L-KG (Blue) indicating that generator is supplying the load.

Utility Power Return

  1. When Utility Power returns, InteliATS:
    1. Qualifies input for minimum, maximum voltage on all phases, correct phase rotation, minimum, maximum frequency
    2. Indicator L-U (Green) illuminates to confirm utility grid voltage is acceptable
  2. Begins time delay (15 minutes), which ensures:
    1. The utility grid has time to stabilize
    2. Delays adding loads to the grid after an outage
    3. Eliminates short-cycling if the grid drops again shortly after returning
    4. Provides a minimum run-time for the generator to ensure it gets up to operating temperature
  3. Opens the coil for K-G [5]:
    1. Disconnects load from Generator
    2. Connects neutral of K-U [3] coil
  4. K-U [3] closes after setpoint time-delay (as short as 1mS)
    1. Connects load to Utility Grid
    2. Disables K-G [5] by disconnecting neutral of coil
    3. Illuminates L-KU (Green), indicating Utility/Grid is supplying load
  5. Begins time delay (2 minutes) for Generator cool-down (running with no load)
    1. Opens KGS [6] to disconnect the generator auto-start signal
    2. Genset stops

Force Generator Operation

Manual Bypass

Voltage, frequency, and phase monitoring is inactive while either bypass mode is active!

Emergency Stop

Bill of Materials

[Incomplete, work in progress]

117 ATS -- Automatic Transfer Switch-Contactor



:: WARNING ::

Follow all applicable electrical codes. Consult a licensed electrician or an electrical engineer for assistance selecting appropriate wire size, circuit breaker, and contactor ratings. These plans assume that you have the necessary expertise and experience, or that you will consult with and work under the supervision of a licensed electrician or experienced electrical engineer, for assembly and implementation. Failure to do so can result in serious personal injury, damage to property, destruction of generator sets and wiring, even causing fires and death.